Description
Fast-track design, hydrological surveys,
environmental impact studies including
public health , air and water quality, as
well as pollution mitigation, in addition
to the design of hardscape, soft escape,
irrigation schemes, aesthetic lighting
and construction documents for 74 km
of motorway and link roads, with 7
grade-separated interchanges, 49
bridges (including 3 railway bridges),
154 box-culverts and 3 toll plazas.