Description
Being one of the major components of Riyadh city network, Improvement and
widening of Thomamah Road, the project scope includes the alignment
studies for the main road crossings and the preliminary / final design studies
besides the preparation of tender documents. The main expressway
comprises of 28 km with 3 lane dual carriageway and a design speed of
100km/hr together with 2-lanes service road and 5 grade separated
interchanges serving the nearby settlements