single page feature image

    Project Details

  • Category:
  • Client: Ministry of Transport
  • Location: KSA
  • Cost: 98 million SAR

    Contact Info

  • Sericon Building, Riyadh
  • +966 11 475 66 55
  • info@euroconsult.com

Dualization of Mirat – Sajer Road / KSA

Description
The project comprises Dualization and widening of existing road and preparation of the tender documents for the
47 km dual carriageways with a design speed of 100km/hr. The road alignment is serving as a secondary road
elements within Riyadh Province. The scope include also the detail design of storm drainage and flood protection
works to protect road alignment

Services Performed
• Dualization of existing road
• Preliminary & Final Design studies
• Preparing of Tender Documents

Project Components
• 47 km of Dualization of Mirat – Sajer Road
• 1 at-grade intersection type C.