Client

General Authority of Civil Aviation-King Abdul-Aziz International Airport-Jeddah

Construction Cost

123 million SAR

Services Performed

  • Road Design.
  • Architectural design.
  • Electrical work design.
  • Drainage design.

Project Components

  • 7 km of 3-lane ( 7 at Gates) dual carriageway
  • 5 km service roads
  • Gates buildings (Gate 14, 17)
  • Temporary parking for buses.
  • Employees parking (3,000 cars).
  • Central bus parking (2,000 bus).

Description

This project is one of the most important projects that contribute to facilitating the relocation of pilgrims to and from Makkah through the King Abdul Aziz International Airport in Jeddah, which is Haram Gate. The project scope of work include road design, Architectural design of the gates and facilities, buildings related, Electrical work design,. The scope also comprises the detailed design of the required drainage works and flood protection measures to protect the project area against flash floods. It also include landscaping and irrigation, street lighting, and road safety features.