Client

Ministry of Transport (sub-contracted by Al-Omayer)

Construction Cost

105 million SAR

Services Performed

  • Detailed Design.

Project Components

  • Wadi Bridge carrying Dualized Roadway.

Description

The scope of the project comprises detailed design of bridge structures with an area of about 15,000 m2 .along Al-Riyadh / Al-Hayer Roadway. The project comprises of a two way road bridge, each carrying 3 lanes, while spanning 6 openings, with each being 77 meters, and having a total length of 462 m.