Client

Ministry of Transport / KSA, 2012

Construction Cost

225 million SAR

Services Performed

  • Alignment Selection
  • Preliminary & Final Design
  • Tender Documents

Project Components

  • 12 km of 4-lane dual carriageway.
  • 2 grade separated
  • 3 Wadi Bridges.

Description

Alignment selection, preliminary and final designs, and preparation of tender documents for an 12 km 4-lane dual carriageway passing through safak mountains comprising 2 grade separated interchanges; drainage network, landscaping and irrigation, street lighting, and road safety features.