Description
Corridor & alignment selection, preliminary & final design studies, preparation of
tender documents for the 79 km single carriageways (2*3.65 lane width and 2.5
shoulder width) with a design speed of 80km/hr. The project components having
different lengths are scattered in the project are serving as secondary road
network elements in Asir Province.