Description
Alignment selection, preliminary and final designs, and preparation of tender documents for an 30 km link with 4 lane dual carriageway, design speed of 120km/hr, 3 Lanes service roads serving the nearby settlements, 10 grade separated I/C, 8 wadi bridges, drainage network, landscaping and irrigation, street lighting, and road safety features.