Description
Corridor & alignment selection, preliminary & final design studies,
preparation of tender documents for the 36 km single carriageways (2×3.65
lane width and 2.5m shoulder width) with a design speed of 80km/hr. The
project components having different lengths are scattered in the project are
serving as secondary road network elements in Asir Province.